新闻中心

News Center

新闻中心

爱游戏,鼓泡式流化床污泥焚烧炉耐火喷涂料施工质量控制 张奇, 林莉峰, 刘斌(上海市政工程设计研究总院有限公司,上海 200092)

发布时间:2024-05-10

焦点提醒:鼓泡式流化床污泥燃烧炉耐火喷涂料施工质量节制 张奇, 林莉峰, 刘斌(上海市政项目设想研究总院无限公司,上海 200092) 中国给水排水2023年中国污水中国给水排水2023年城镇污泥处理处置技术与应用高级研讨会(第十四届)邀请函处理厂提标改造(污水处理提质增效)高级研讨会(第七届)邀请函暨征稿启事中国给水排水2023年中国污水处理厂中国给水排水2023年城镇污泥处理处置技术与应用高级研讨会(第十四届)邀请函提标改造(污水处理提质增效)高级研讨会(第七届)邀请函暨征稿启事

  • 首 页
  • 期刊引见
  • 编委会
  • 投稿须知
  • 文章查询
  • 学术会议
  • 告白合作
  • 刊行定阅
  • 在线留言
  • English上一篇下一篇PDF下载[1]张奇,林莉峰,刘斌.鼓泡式流化床污泥燃烧炉耐火喷涂料施工质量节制[J].中国给水排水,2022,38(4):114-119. ZHANGQi,LINLi-feng,LIU Bin.Construction Quality Control of Refractory Spray Coating for Bubbling Fluidized Bed Sludge Incinerator[J].China Water & Wastewater,2022,38(4):114-119.点击复制

    鼓泡式流化床污泥燃烧炉耐火喷涂料施工质量节制中国给水排水[ISSN:1000-4062/CN:12-1073/TU]卷:第38卷期数:2022年第4期页码:114-119栏目:出书日期:2022-02-17
    Title:
    Construction Quality Control of Refractory Spray Coating for Bubbling Fluidized Bed Sludge Incinerator
    作者:
    张奇, 林莉峰, 刘斌
    (上海市政项目设想研究总院<团体>无限公司,上海 200092)
    Author(s):
    ZHANG Qi, LIN Li-feng, LIU Bin
    (Shanghai Municipal Engineering Design and Research InstituteCo. Ltd., Shanghai 200092, China)
    要害词:
    鼓泡流化床燃烧炉;喷涂料施工;质量节制
    Keywords:
    bubbling fluidized bed incinerator;spray coating construction;quality control
    摘要:
    以上海市白龙港污泥处置措置二期项目为例,引见了鼓泡流化床燃烧炉内衬材料的设想环境,给出了喷涂料施项目序,总结了施工进程的质量节制手艺要点,并对烘炉后燃烧炉耐材施工质量结果进行了验证。喷涂料施工前,经由过程试喷肯定施工工艺参数,经由过程绘制喷涂区块排邦畿来指点现场施工,在节制每区块厚度和喷涂质量的同时使全体喷涂质量到达尺度。在喷涂施工进程中,按照试喷工艺参数节制好加水量、气压、喷枪角度等确保喷涂质量。完成燃烧炉耐材施工全数工作后,在烘炉阶段,按照现实施工情况、材料加水量,理论烘炉温升曲线0~125 ℃温升阶段,由5 h调剂节制在8 h,放缓温升速度,避免温升过快致使水份解除不顺畅,削减裂纹发生。该项目燃烧炉内衬耐火喷涂料施工质量到达了节制尺度要求。
    Abstract:
    Taking the phase Ⅱ sludge treatment and disposal project in Shanghai Bailonggang as an example, the design of lining materials for bubbling fluidized bed incinerator is introduced, the spray coating construction procedure is provided, the quality control technical points in the construction process are summarized, and the construction quality effect of refractory materials for incinerator after drying is verified. Before spraying, the construction parameters are determined by trial spraying, and the layout of spraying blocks is drawn to guide the field construction, thus the overall spraying quality can reach the standard while controlling thickness and spraying quality of each block. During the spraying process, the spraying quality is guaranteed by controlling the amount of water, air pressure and spray gun angle according to the trial spraying process parameters. In the drying stage after completing all the refractory material construction work of incinerator, the 0-125 ℃ rise stage in the theoretical temperature rise curve is adjusted from 5 to 8 h, according to the actual construction environment and material water addition, so as to slow down the temperature rise speed, avoid poor water drainage and reduce cracks due to too fast temperature rise. The construction quality of fire-resistant spray coating for the incinerator lining of the project has reached the requirements of control standard.
    更新日期/Last Update:2022-02-17


沪公网安备 31011002002837号